Barnes Army Aviation Support Facility Energy Efficiency Upgrades

Painting & replacing the hardware on 11 existing steel personnel doors; replacing two (2) existing personnel doors & frames with new FRP doors and frames; and replacing nine (9) existing overhead doors with new insulated overhead coiling doors including motors, controls, and guides, and repainting steel around existing openings. Note: See special Project requirements in Section 01 11 00, paragraph 1.10.

Status

Accepting Bids

Bid Date9/19/19 2:00 pm

Company & Contacts

Kurtz Inc

Shaun Bush- estimating@kurtzinc.com   413-568-0636x103

Location

Westfield MA

Provide quotes to Kurtz, Inc. by 9/17 9:00 a.m. Prevailing rate, tax exempt, OSHA 10 required.